06/2011-Present
FiberLight, LLC
Project Manager for OSP Construction
§
Preform
site surveys at different commercial buildings and cell sites to determine
which route to add fiber laterals and where to enter the facilities from
our existing fiber infrastructure
§ Manage jobs from design,
installation, integration and acceptance from customers
§ Performed site walks with T-Mobile
personnel at various T-Mobile cell sites for a large mobile backhaul
project
§ Discussed adding fiber into
T-Mobile switch site in Houston, performed site walk for adding equipment
at the Houston Switch.
§ Preparing to add fiber into
T-Mobile cell sites around the Houston Market for backhaul to switch.
§ Added fiber laterals into and around
70 buildings and over 100 cell sites.
§
Work with
our engineering firms to get drawings completed and permitted through the
City of Houston, different counties, and TXDOT in a timely fashion
§
Put the
jobs out for bid for the OSP construction
§
Put the
jobs out for bid for fiber splicing
§
Award jobs
to the various vendors depending on prices and quality of work
§
Schedule
the work with our contractors based on the priority of the sites
§
I am a
liaison between different buildings and cell site companies to schedule the
work as well as to follow up to make sure everything is going smoothly.
§
Follow up
with property management making sure there isn’t any complaints
§
Dispatch
contractors to fix any fiber cuts, come up with a plan to fix them.
Stay at site until work is complete and stay in constant communication with
them
02/2009-06/2011
CWF
Solutions
Construction Manager for Distributed
Antenna Systems
§
ATT
§
Conduct pre
job walk through with customers and answer any questions that they might
have
§
Run crews
from six to thirty installers on DAS installation team depending on what
type of building we were putting it in i.e. hotel, stadium, or convention
centers.
§
Coordinate
between ATT, hotel managers, and other customers to get materials on site
and make sure job is progressing on schedule and under hours
§
Schedule
daily work for the field technicians under my supervision
§
Make sure
all work will pass quality as set by ATT
§
Perform
commissioning, integration of the DAS equipment, i.e. Mobile Access,
Andrews, etc.
§
Make sure
all cable and antennas are installed per blue prints
§
Help
commission the Erickson radios with the Erickson personnel
§
Perform
final job walk through and sign off
§
Perform
sweep testing using an Anritsu test set
§
Perform
installation, testing, commissioning and integration of Ericsson Node B
equipment's
§
Perform LTE
BBU-in the Box Troubleshooting Perform voice call test, alarm
clearing, and troubleshooting, for the following. UMTS 3106, 3206,
LTE RBS 6601 and DUW RBS 6601.
§
Conduct
site equipment audit for UMTS roll-out
§
Perform
FX-11 integration on RBS 3206 and 3106 equipment's along with installation
of the Cisco router and integrating to the Node B .Performed O&M
support during Node B migration and conduct data/voice call tests.
§
Perform
installation for LTE equipment including GPS antenna, SAU and alarms punch
down to the 66 block.
§
Install and
integrate OBIF equipment for 3rd,4th 5th and sixth carrier
§
Along with
being a level four installer at general wire line and wireless offices
throughout Texas and Louisiana.
§
Verizon
Wireless
§
Lead
installer of Alcutel 4G LTE equipment in Verizon Wireless Cell sites
§
Lead
installer of Alcutel 4G LTE equipment in Verizon Wireless Switch sites
§
Installed
World Wide Packet switches in Verizon Wireless Cell Sites
§
Installed
GMS equipment in Cell sites
§
Installed
Cisco routers in Verizon Cell sites for Windstream
§
Commissioned
Cisco routers in the Verizon Cell sites and Switches
§
Commissioned
World Wide Packet Switches for Windstream
§
Commissioned
Alcutel 4G LTE equipment for Windstream
§
Installed
and commuted UMTS equipment in Cell sites
§
Installed
Bays, fuse panels, ran cable to power source in Cell
o
Sites.
08/2007-
02/2009
MGI Network
Services
Austin, TX
Implementation Engineer
§
Tested and
turned up Ekinops DWDM 4G network for Clearwire at cell sites
§
Tested
fiber for Ring performance
§
Balanced
and Optimized DWDM Ring and put the Ekinops systems on the ring.
§
Tested 432
pair fiber going from Chicago to New Jersey
§
Performed
OTDR, FOX testing on Clearwire network fibers
07/2003-06/2007
Tellabs Operations,
Inc.
Houston, TX
Field Service Engineer
§
Preformed
regular duties as FSE
§
Completed
Software Upgrades on 5500
§
Assisted on
Core Expansions on 5500 systems
§
Acceptance
testing on legacy equipment and HD equipment
§
Been
certified on Ethernet Shelves, VQE Shelves, and NB Shelves
§
Put
software patches on Tellabs 5500 systems
§
Completed
Various web based courses on Tellabs 7100, 5500 NGX, 8800 and other Tellabs
equipment
§
Went on
Trouble Calls for Customers
6/2002-6/2003
Aztec Communications
Houston, TX
Lead Installation
Analyst/ Project Manager
§
Planned and
engineered telecommunication sites and buildings for various customers
§
Tested and
Provisioned all types of equipment for T-Mobile and McLeod
§
Project
Manager of adding Nokia equipment to T-Mobile Cell sites
§
Made sure
Nokia equipment was installed at specs. for T-Mobile and on time.
§
Project
Manager of over 900 cell site upgrades
§
Upgraded RF
Towers and worked to troubleshoot with the Techs.
§
Help test
cell site equipment
§
Installed
new T1 circuits at all cell sites
§
Re-installed
grounding to BTS units at cell sites
§
Re-installed
power to BTS units at cell sites
§
Seated new
cards in BTS equipment
§
Worked with
customers to help them decide what services they might need
§
Installed
and configured VOIP
§
Tested
equipment once installed with various test equipment
§
Updated
blueprints and specs to make sure they were correct with what was installed
§
Was project
manager of various telecommunication equipment installs
2000-2002MCI WorldComHouston, TX
Texas Capacity and OSP Detail Engineer
§ Detail Engineer at MCI WorldCom
working with installation vendors, customer purchasing, and OSP fiber
installs
§ Write detail specs for all
installation of telecom equipment
§ Quote projects to make sure they
were done within budged hours
§ Manage fiber network and make sure
there we had adequate capacity.
§ Work with OSP construction to
overbuild fiber that was at capacity.
§ Work with OSP construction to add
laterals into buildings for new customers.
§ Actively involved in the
engineering and permitting process
§ Preform quality audits on
installation of equipment
§ Plan for future projects and
budget money for them
§ Attend internal and external
budget and expense meetings
§ Project trends to cover the risks
vs. gains for jobs
§ Develop and implement Plan of
Action for Texas
§ Work on various Task Forces to
develop company-wide policy
|